Construction Notice – Bonnycastle Pathway Replacement

2022 ACTIVE TRANSPORTATION PATHWAY RENEWAL – RHG BONNYCASTLE SCHOOL PATHWAY – SYRACUSE CRES. TO CHANCELLOR DR

Very exciting news! Pleased to have been working with the City to have a replacement of the Bonnycastle pathway! This pathway runs along side the large pond(s) in Waverley Heights and travels behind Bonnycastle School. This pathway is heavily used by area residents and students and is in dire need of an upgrade.

The angle of the pathway will be modified around the bridge, ensuring a safe turning radius and preventing some high speed cyclists from landing in the pond! The beautiful walking bridge over the pond has now been upgraded and painted. I am frustrated by the graffiti that keeps showing up on the new boards, but hopefully they have it out of their system and the novelty has worn off!

Work on the pathway will include:
• Excavating and removing the existing path
• Laying a new sub-base and base structure
• Paving the new path
• Regrading and landscaping around the pathway

See construction details.

  • Construction Start: August 18, 2022
  • Duration: Approximately 3-4 weeks, weather permitting

 

If you have any questions about the project, please contact:

Erik Hansen

Project Manager

City of Winnipeg

(204) 986-3249